Guides

Perc tests and soil evaluations for septic systems

Last checked November 19, 2026

What a percolation test measures, why many places now use soil evaluations, who may do either, and what it means if you are buying a lot or a house.

A "perc test" (percolation test) is about whether soil on a site can absorb the liquid a septic system sends to it. It matters most when a system is being designed or replaced, and when you are buying land. It is not the same as inspecting an existing system.

What a perc test measures

University of Nebraska–Lincoln Extension explains the soil percolation rate as how quickly water moves through soil, measured in minutes per inch. It says slower rates require larger drainfields, and very slow rates may be unsuitable for a drainfield. The test measures how long it takes water in a test hole to drop one inch.[1]

The Nebraska procedure, based on that state's rules, is detailed. It calls for at least three or four holes where the drainfield is planned, roughened sidewalls, a layer of gravel, a presoak (at least four hours and preferably overnight, and longer in clay), a measurement the next day, and no testing in disturbed or frozen ground.[1] The guide also notes that Nebraska's rules say only certified people (such as a certified inspector, installer, soil evaluator, registered environmental health specialist, or licensed professional engineer) may conduct the test, and that local requirements may be stricter.[1] That is one state's rule. Check yours.

Why many places use soil evaluations instead

University of Illinois Extension says that using soil evaluations to judge a site for a septic system is becoming more common in Illinois. In a typical evaluation, three or four soil borings or backhoe pits are dug at least 50 feet apart near the future field to at least 60 inches, soil layers are described, and a sewage loading rate is set from the state code.[2] A key advantage over a percolation test, Illinois Extension says, is that a soil evaluation can find layers that severely limit a system, such as bedrock, a seasonal high water table, dense slowly permeable soil, or very sandy or gravelly soil with rapid permeability. The state code specifies at least two feet of separation between the bottom of the field and the limiting layer, and three feet in coarser soils.[2]

Maine's CDC is a clear example of a state that has moved on. It says soil percolation tests were used previously to judge soil suitability, and that rules requiring on-site soil evaluations for the design of all subsurface wastewater disposal systems took effect in July 1974.[3]

The takeaway: whether a perc test, a soil evaluation, or both is required is a local or state decision, and rules differ. Ask your local permitting agency before you hire anyone. EPA says that under most regulatory programs the local permitting agency conducts a site assessment to decide whether the soils can provide adequate treatment, and that those programs set required distances from buildings, driveways, property lines, and surface waters.[4]

If you are buying a house with an existing system

A perc test is not what tells you whether an existing system works. For that you need an inspection of the system itself, including the drainfield. See what a septic inspection includes and dye test vs. full septic inspection. Maryland's guidance notes that the records file at the local health department may include soils or percolation test data, and that an inspector should search it.[5]

If you are buying a lot or a house that may need a new system

This page is a reading of official and reputable published pages, not legal, lending, or engineering advice. Septic rules are set by states, counties, and local health departments, and they change. Confirm anything that affects a sale or a loan with your local health department, your lender, and your closing attorney or agent.