State rules / New Mexico
New Mexico septic property transfer evaluation
Last checked November 19, 2026
New Mexico requires the seller to have a septic system evaluated before transfer, with the report filed with NMED. Process, fee, and unpermitted systems.
Short version: The New Mexico Environment Department (NMED) says that before a property with an established onsite liquid waste (septic) system is transferred, the transferor must have the system evaluated, under 20.7.3.902.E NMAC. The evaluation must be done by a qualified evaluator using a department-approved form.[1]
Process
- Find the permit. NMED recommends a permit search first, which it says can take up to 10 days. It offers a do-it-yourself permit search page for systems installed before 2017 and asks you to contact the local NMED field office for systems installed in 2017 or after.[1]
- Evaluate. If the system is permitted, a qualified evaluator evaluates it before transfer and provides the department-approved report to NMED within 15 days of the evaluation.[1]
- File and pay. NMED charges a $50 fee before it date-stamps the report as received. The report becomes an official record for your use in the transfer, and NMED places a copy on file with the permit.[1]
- Fix deficiencies. A permit or variance application to correct deficiencies or violations must be submitted within 15 days of the evaluation by the party who is or will be the owner on the 15th day after the evaluation.[1]
Unpermitted systems
If the owner cannot show a permit and NMED cannot find one, the system is considered unpermitted. NMED says it may be registered or permitted if it passes inspection by an NMED inspector or an Installer Specialist, and that if an unpermitted system fails evaluation the owner is responsible for obtaining a permit to remedy the deficiencies.[1]
Advanced treatment systems and holding tanks
At transfer, the new owner must submit a permit amendment for the ownership change and provide NMED a copy of a valid maintenance and sampling contract in the new owner's name.[1]
Extension
NMED lists a "Request for Extension of Property Transfer Evaluation" form for a permitted system that was evaluated or inspected within the last 180 days and has not been in use since, to request an additional 180 days.[1] Read the form for the full conditions.
What this page does not cover
NMED's page points to the qualification rule (20.7.3.904.B NMAC) for who counts as a qualified evaluator, which we did not read from an official source, so we do not list the qualifications. Ask NMED. The page does not say who pays the evaluator.
See also septic inspection when buying a house and the sister site's New Mexico private well testing guide.
Sources
Every page below was fetched on November 19, 2026. If an official page has since changed, the official page wins.
This page is a reading of official and reputable published pages, not legal, lending, or engineering advice. Septic rules are set by states, counties, and local health departments, and they change. Confirm anything that affects a sale or a loan with your local health department, your lender, and your closing attorney or agent.